Low pressure FGSS P&ID
- Gas supply pressure: 10~14 barG (main engine), 6~8 barG (Generator);
- Gas supply temperature: 0~60 ℃;
- System composition: LNG Bunkering Station, LNG tank & TCS, LNG Vaporization heating unit, BOG compressor unit, water/glycol circulation unit, control system and ESD system;
- Optional equipment: ship-shore connection system, ventilation system, gas detection system, N2 supply generator and double-wall pipe, etc.;
- Supporting models: low pressure two-stroke main engine, low pressure four-stroke main engine, generator, gas boiler, etc.
http://www.sunruimarketing.com/